2012 Projects



In 2012, the following projects have been completed or are currently in progress:

 

Melbourne Olympic Park – Margaret Court Arena Redevelopment

  • Client: Lend Lease
  • Substructure package including construction of pilecaps, ground beams & slab construction.


568 Collins St Melbourne

  • Client: Hickory
  • Bulk excavation & retention package including construction of sub-structure pilecaps, ground beams & shotcrete wall.


151 Franklin St Melbourne (Fulton Lane Apts)

  • Client: Hickory
  • Piling, excavation & retention package for 3 level basement on 5,800 m2 site.


Kingsway Glen Waverley (Ikon Apts)

  • Client: Hutchinson Builders
  • Excavation & Retention package for 3 level basement.


Rosebank Apts, Clayton

  • Civil package including concrete & asphalt pavements, kerb & chanel & retaining walls


296 Middleborough Rd Blackburn

  • Client: MAV Group
  • Basement excavation & shotcrete wall works.


2 Queen St Blackburn

  • Client: Verve Constructions
  • 2 level basement excavation & retention package.


119 Alexandra Ave South Yarra

  • Client: Verve Constructions
  • 3 level excavation & retention works.


31 Crisp St Hampton

  • Client: Geotechnical Engineering
  • Basement excavation & shotcrete wall works.


33 Lynch St Hawthorn

  • Client: Geotechnical Engineering
  • 2 level basement excavation, shotcrete wall works & substructure package including construction of pilecaps & slab.


7 Berkeley St Doncaster

  • Client: Geotechnical Engineering
  • 2 level basement excavation, shotcrete wall works.


1 Watt St Box Hill

  • Client: Cooper Morison
  • Basement excavation & retention works.


Lalor & South Morang Special School

  • Client: MSDS
  • Carpark & footpath civil works.